Projects

Catalina-Bay-300-x-200

Catalina Bay

This project is ongoing with Stage 1 plumbing and drainage now complete, this site includes retail, hospitality and commercial spaces designed to be the hub of the Hobsonville Point development.

eo-300-x-200

Everil Orr Retirement Village

Stage 1 of stylish and functional retirement apartments.

hb-300-x-200

Habitual Fix

MCB has completed the plumbing works for multiple branches Auckland wide from the kitchens to bathrooms resulting in in functional finished stores.

mcb-300-x-200

McCallum Industries Ltd (NZ)

MCB Plumbing completed the stainless steel drainage work for the new wing of the existing factory.

mcb-300-x-200

NZ Dairy Company

MCB Plumbing has completed the plumbing and drainage works to the latest factory upgrade.

og-300-x-200

OnGas

MCB plumbing completed the Plumbing and Gas works to the new LPG bottling plant and office block.

sanitarium-300-x-200

Sanitarium

This is an ongoing project to upgrade Marmite`s food processing plant.

villa-300-x-200

Royal Terrace

MCB was a part of this old villa revamp for plumbing and drainage.

central-300-x-200

Building B Central Park

MCB did the plumbing to 5 levels serving office spaces, this included all ablutions and amenities, a range of businesses have chosen to be located at Central Park from large global corporates such as Restaurant Brands and Genesis Energy to smaller professionals.

mad-mex-300-x-200

Mad Mex

Over the years MCB has started and finished shops Auckland wide, from bathrooms to the kitchen plumbing and gas, working in with kitchen staff to come out the other side with a functional and compliant finished product

mfw-300-x-200

Meat Fish Wine

MCB completed commercial kitchen plumbing and gas including a tailored feature wash hand station.

animates-300-x-200

Animates Pet Shops

We have carried out the refurbishment and new build including custom dog baths, install of coin operated wash stations and all plumbing and drainage NZ wide.

eye-300-x-200

Auckland Eye Institute

MCB carried out base build works including threshold drainage and stormwater systems for a compliant finish

aesop-300-x-200

Aesop

MCB helped design and install the custom tapware at Aesop Fort St

bauer-300-x-200

Bauer Media (NZ)

With a 5 month deadline, we carried out this complete refurbishment of the previously (nearly 20 years long) abandoned building including downpipes, services and ablution blocks

tsg-300-x-200

Tyler St Garage Bar (TSG)

MCB completed the full kitchen and the bar areas which were finished in a rustic style to match the theme

food-truck-300-x-200

The Food Truck Garage

MCB carried out the plumbing and gasfitting for this industrial decor eatery which was completed in 2014 in 3 months.

m-300-x-200

M Central Apartments

MCB completed works for M Central, the next generation in freehold apartments, with 113 residential apartments from 1, 2, 3 & 4 bedroom and 2 levels of Retail Units

frucor-300-x-200

Frucor Uprising

MCB did the refurbishment of this former car assembly plant, this involved an office upgrade and ablution blocks to domestic and non potable water supplies and plumbing and gas to hot water plant and mains.

z-300-x-200

Z Energy Station

MCB helped reach completion of several Z Energy Stations Auckland Wide, this included all irrigation and facilities within the station.

aig-300-x-200

AIG Building

This is an ongoing renovation of office spaces and ablution blocks MCB is carrying out.

fc-300-x-200

Fresh Choice Ranui

MCB achieved completion for fit-out 2 two weeks earlier than programmed for the Butchery, Bakery, wash down facilities and ablutions.